Units 15-22 Gravelly Industrial Park, Birmingham
Client: Standard Life

Prestec recently completed a major design and build refurbishment of the Industrial Units at 15-22 Gravelly Industrial Park, Birmingham, which is already 50% occupied. 

The value of the works was £1.3M and involved the complete replacement of all cladding and asbestos roofing and the demolition of all internal offices. Prestec effectively took the units back to their structural frame. New toilet blocks were formed in each unit, concrete floors were repaired and painted, car parking was increased and the entire area was landscaped to suit. The first four units were let before completion and Prestec worked with the new tenants and their sub contractors to ensure their fit out works proceeded without any problems.